HyLoft 01031 Manuel d'instructions Page 2

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 9
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 1
Approximate Assembly Time: 30 minutes or less
MOUNTING THE UPRIGHT SUPPORTS
TO THE WALL STUDS
Using a stud finder, locate 2 wall studs that are 32" to 48" center to center apart. Using a pencil,
mark the top mounting hole centers. Make sure holes are level and the same distance from the
floor. Pre-drill the 2 marked holes using a 3/16" (5 mm) drill bit.
IMPORTANT: Unit MUST be installed into wall studs. Do not use wall anchors for mounting directly to
sheet rock.
32"
to
48"
centers
Fasten vertical tubes of Left & Right Sides(A & B) to top pre-drilled holes
using a 7/16"(11 mm) nut driver or socket wrench, making sure holes are positioned as shown.
Do not fully tighten top screws at this time.
Make sure that Vertical Tubes of Left & Right Sides(A & B) are vertically level (plumb), & drill through
remaining 2 holes in each. Fasten with remaining Lag Screws(C) and fully tighten.
with 1 Lag Screw(C) in each
1A
1B
Page 3 of 12
Vue de la page 1
1 2 3 4 5 6 7 8 9

Commentaires sur ces manuels

Pas de commentaire