HyLoft 00540 Guide d'installation Page 2

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 9
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 1
INSTALL ANGLE BRACKETS
Using Stud nder
locate Joists
24" to 36"
apart
Mark holes on joist exactly apart.
Important Tip:
There is a hole template
printed on the bottom of the carton. Cut out
the panel, punch out the holes and tape
to the ceiling to use for pencil mark locations.
44.25"
Pre-drill 3/16" holes at pencil marks for each of the mounting points on the Support Bar Assemblies(C).
Rub some bar soap or add a drop of liquid soap to the threads of the lag screws to ease installation.
Using a Socket Wrench or Nut Driver, install one Support Bar Assembly(C)using the 5/16" x 2 1/2"
Lag Screws(D) into each pre-drilled hole.
Repeat this process for installation of the remaining Support Bar Assembly(C) , being sure to install it
parallel and in line to the rst one.
Ceiling Joist
1B
1A
Pencil mark
Installation time approximately 30 minutes or less
Before beginning the unit installation , decide where it will work best for you above the open garage
door (if room allows) or beyond the open door.
If installing above the open garage door: at least 17" of open space is required
between the highest point of door as measured during its upward travel and the ceiling.
Locate the ceiling joists in the area of desired installation and determine the direction in which they are
running. In order to adequately disperse the stored load, you should not install more than two HyLoft
units on any two ceiling joists. The Ceiling Brackets are installed parallel to the ceiling joists. Refer to
the diagram below or photos on the package for additional installation clarication.
PLEASE NOTE:
D
IMPORTANT: Do not over tighten the lag screws (max 10 ft. lbs). They only need to be snug down,
no more. Do not use an impact driver.
Vue de la page 1
1 2 3 4 5 6 7 8 9

Commentaires sur ces manuels

Pas de commentaire